Blackheath Cator Estate Residents Limited

HOME | HISTORY | THE COMPANY | FINANCE | RESIDENTS' INFORMATION | LINKS | GRAFFITI HOTLINE | MAP | GALLERY


Blackheath Cator Estate
Residents Ltd

Chapman House
10 Blackheath Village
London SE3 9LE

T/F: 020 8297 1210

office@blackheathcatorestate.co.uk

The office is open  Monday-Friday
9am-3pm

Administrators:
Miriam Hier
Vicki Graham
 

Along Blackheath Park Along Blackheath Park

by

Judith Cresswell

 

RESIDENTS' INFORMATION  

ROADS
TREES
CONTROL OF TRAFFIC
MAINTENANCE
FILMING
PLANNING APPLICATIONS BUILDING WORKS
SKIPS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

ROADS

The Company has an extensive rolling programme of maintenance and improvement of the Estate’s roads and pavements. Improvements include patching, resurfacing and sometimes reconstruction. The roads and pavements are inspected regularly and the necessary works are scheduled according to priority. The 2008 programme of works is set out below:

Blackheath Park
Relaying of brick paving on North Side                                  
 Sept
Pavement from 59A to 57as one stretch                                   Sept
Raising of setts opposite The Lane                                           May
Pavement and crossovers from The Lane to Brooklands Park
carried over from 2007)                                            
              May
Speed bump outside church  (from 2007)                            End August
Crossovers 45A, 49 & 53 (from 2007)                                    May
Crossover 47                                                                           May Papillons Walk to Bernesmede (inc Bernersmede crossover)   
 May

Brooklands Park
Pavement holes outside No14                                                  
 Sept
19 Brooklands Park crossover
Brookway/Brooklands Park Junction                                         April 

Foxes Dale
Pavement from No 2 to junction with Meadowbank                   Sept
 

Meadowbank/ Parkgate
Parkgate to Meadowbank patch repairs                                     May
Resurfacing Meadowbank                                                         June
Resurfacing Parkgate stretch to junction                                     June
Footpaths                                                                                  May
 

Morden Road
Levelling of road and preparation for resurfacing                         Feb
Resurfacing                                                                                
June 

Pond Road
By crossover to Birchmere Row
Pavement from 13-17– med priority                                          Sept
Road patch repairs at top of Pond Road                                    April
Kerb and road edge repair alongside Paragon House                 Sept
Resurfacing of top end of Pond Road                                        June 

Priory Park
Stretch on south side outside The Priory                                    Sept

(opposite no 7 to The Priory crossover inc strip around lamppost)             

   

^TOP

 ©BCER LTD 2006